• MONUMENTS OF CULTURAL HERITAGE
  • • Profound preliminary studies, site visit, scheduled initial action plan over the site
  • • Document preparation over the specific requirements of the low CHA (Cultural Heritage Act)
  • • Profound research and analysis leading to the right methodology
  • • Produce general project time line
  • - Perform architectural survey and research technology that can be used in the particular case
  • - If necessarily depending on the toughness of the project - surveying, photogrammetric survey and others.
  • - Depending on the specific project - can be made other laboratory studies of dating, unveiling the optimal date of the objects and details, etc.
  • - Some studies can be made about every possible archive found
  • - Typological study
  • - Analysis of the heritages, left by the time
  • - Preparation of prescriptions for conservation and restoration work
  • • Preparation of complete project design (preliminary, technical and working) a methodology for:
  • - Taking emergency measures
  • - For Reconstruction
  • - For the conservation-restoration and adaptation works
  • • Managing the process of entering into special regulations and documentation, receive letters and correspondence with the specialized institutions
  • • Implementation of supervision and verifying quality and compliance with the project documentation and management.
  •